Dezadeash River Bridge Rehabilitation

Location: Haines Junction, YT

Scope of Work: Served as General Contractor for the project, overseeing all aspects of safety and coordination. Scope included the design, fabrication, and installation of access scaffolding, addition of permanent structural steel to facilitate jacking, execution of an engineered jacking plan, and replacement of the bridge bearings. All work was performed over a fast-flowing river, requiring meticulous planning to ensure safety and stability.

Year Completed: 2020