Klondike River Bridge Rehabilitation
Location: KM 0.3, Dempster Highway #5
Scope of Work: Subcontracted by CMF Construction to support bridge upgrades. Scope included traffic control, site safety, access scaffolding, and the fabrication, painting, and installation of strengthening plates. We also engineered and carried out a jacking plan to safely replace the bridge bearings.
Year Completed: 2017